Project · Post-construction cleanup
40 Yards of Construction Debris Out of a Mizner Estates Home in One Day
By Cesar Hurtado, owner · Published
In Mizner Estates, Boca Raton, a 3-man crew spent 8 hours removing 40 yards of construction debris. Then they swept and organized the site so the finishing trades could start.
- Job date
- Where
- Mizner Estates, Boca Raton
- Our part
- Sent a 3-man crew for 8 hours to remove 40 yards of construction debris, then swept and organized the site.


What the job was
A customer in Mizner Estates needed a home cleared of construction debris before the finishing trades came in. We sent a 3-man crew for 8 hours. They removed 40 yards of construction debris, then swept the site and organized it.
The photos show the kind of material involved: cardboard, tile and buckets of debris piled near the trailer on the paver driveway.
The size and service we used
This was post-construction cleanup: our crew did the loading and hauling, then the sweep-up. The customer did not rent a trailer and load it themselves.
Forty yards is more than any single one of our trailers holds (our largest is 24 yards), which is part of why a crew service fits a job like this. More on how it works: construction debris cleanup.
Why that choice fit
In general, post-construction cleanup is timed to the schedule. Finish carpenters, painters and flooring installers need a clear, clean space, and a pile of leftover material slows them down.
A crew that loads, hauls and sweeps in one visit gets the site ready in a day. For an ongoing build where debris piles up week after week, a trailer on site or a recurring pickup can work better. Text photos to (954) 247-1399 and we will help you pick. Let us know when the next trade starts, so the cleanup lands at the right time.
Other Boca jobs are collected on junk removal in Boca Raton. For crew-loaded cleanups elsewhere, see construction debris removal.