House Demolition in Broward County, FL

Sunshine State Junk Removal takes down whole houses in Broward County, including the haul-off and site cleanup afterward. Whole-house demolition generally requires a demolition permit and utility disconnections arranged by the property owner or their contractor, so check with your city's building department first. Book a walkthrough or text photos to (954) 247-1399 to start a quote.

  • 5.0 · 165+ reviews
  • Family- & veteran-owned
  • Haul-off included
Yellow dump trailer hitched to a black pickup in front of a tile-roof home before sunrise

What's included

  • Taking down the house in the agreed scope
  • Removing the slab or foundation, if included in your quote
  • Loading and hauling debris to approved disposal and recycling facilities
  • Keeping clean concrete separate as clean fill where possible
  • Clearing and cleaning up the site

What you handle before we start

  • Get the demolition permit — check with your city's building department for what's required
  • Have electric, gas, water and sewer disconnected by the utility providers and the appropriate parties
  • Handle any required asbestos notification and testing — see the Florida DEP asbestos page
  • Remove personal belongings, or tell us what's left so contents can be quoted
  • Notify your HOA and neighbors if your community requires it

How it works

How a house demolition job runs

  1. Step 1

    Walkthrough

    We walk the property with you to see the house, the lot, access and what stays.

  2. Step 2

    Quote and checklist

    You get a quote and a clear list of what has to be done on your side first: permit, utility disconnects and any asbestos requirements.

  3. Step 3

    Demolition

    Once your side is done, the house comes down within the agreed scope.

  4. Step 4

    Haul-off

    Debris is hauled away, with clean concrete kept separate where possible.

  5. Step 5

    Site cleanup

    The lot is cleared and cleaned up to the agreed condition.

Pricing:every demolition job is quoted on its own scope. Text photos of the area (or book a walkthrough) and we'll send a quote.

What has to happen before a house can be demolished?

In general, whole-house demolition can't start the day you decide to do it. A few things usually have to be in place first, and they're the property owner's or their contractor's responsibility:

  • A demolition permit. Whole-house demolition generally requires one. Requirements vary by city, so check with your city's building department. Broward County's Building Code Division regulates construction in unincorporated Broward County and the cities it contracts with.
  • Utility disconnections. Electric, gas, water and sewer generally need to be disconnected by the utility providers and the appropriate parties before a house comes down.
  • Asbestos requirements. See the next section.
  • An empty house. Belongings should be out, or listed so contents can be quoted as a cleanout.

Sunshine State Junk Removal doesn't pull permits, disconnect utilities or do asbestos surveys. When we quote a house, we'll give you a clear list of what has to be done on your side before demolition day, so the schedule doesn't stall.

Do asbestos rules apply to house demolition in Florida?

They can. According to the Florida Department of Environmental Protection, the federal Asbestos NESHAP (40 CFR Part 61, Subpart M) sets work practices for demolitions and renovations of structures and buildings, excluding buildings that meet the residential exemption criteria in the NESHAP. Florida DEP administers the program under Chapter 62-257, Florida Administrative Code.

For buildings subject to the NESHAP, the regulations require the owner of the building and/or the operator to notify the applicable compliance office before any demolition or renovation. DEP's page says notice must be submitted at least 10 working days before the project start date, using DEP Form 62-257.900(1). Notices go to the appropriate district or local program compliance office, and Broward County is listed as a local program.

Whether your house is covered depends on the building and the project, so read the DEP page and contact the compliance office it lists before scheduling demolition. We don't accept or haul asbestos.

What affects the scope of a house demolition?

  • Size and construction. Wood frame, block and mixed construction come down differently and produce different debris.
  • The slab and foundation. Leaving them in place or removing them changes the job significantly.
  • What's left inside. An empty house is faster; contents can be quoted as a cleanout.
  • The lot. Access for trailers, trees, fences, pools and neighboring homes all affect how the work is done.
  • What stays. A pool, driveway, fence or detached structure you're keeping needs to be protected.

Every house demolition starts with a walkthrough, because photos can't show everything that matters on a job this size.

During the walkthrough, we look at access for loading, what is close to the house, and where clean concrete can be kept separate from mixed debris. You get a quote with the scope spelled out, including what is staying on the lot and what condition the site will be left in when the job is done.

Dumpster sizes

Trailer sizes that fit this debris

A house produces a large volume of mixed framing, drywall, roofing and fixtures, which suits the 21 or 24 yard trailer. Slabs and block are heavy; each rental includes 1 ton and $120 per ton over that, so concrete is best handled as separate clean fill.

Real jobs

Related real jobs

From our Google Business Profile posts. Each card says exactly what our part of the job was.

Yellow dump trailer hitched to a black pickup in front of a tile-roof home before sunrise

18-yard trailer for pool deck demo

18-yard trailer for a pool deck demo in Weston

August 30, 2026 · Weston

We dropped off an 18-yard trailer early in the morning for a pool company's pool deck demo. The load was kept as clean fill (concrete and dirt) and recycled, saving the customer disposal fees.

Our part: Supplied an 18-yard dump trailer and kept the load as clean fill for recycling; the pool company did the demolition.

Read about this job →
Two yellow dump trailers parked on gravel near the water beside a white building

Clean fill hauling

Clean fill concrete loads for an oceanfront project in Coral Gables

August 13, 2026 · Coral Gables

We hauled multiple dumpster loads of clean fill concrete for a contractor's oceanfront project.

Our part: Hauled multiple dumpster loads of clean fill concrete.

Read about this job →
Yellow dump trailer loaded with tarped cardboard boxes outside a three-story building

Post-construction cleanup

Post-construction cleanup at a medical center in Pompano Beach

August 9, 2026 · Pompano Beach

We cleared post-construction debris at a medical center for a contractor.

Our part: Cleared and hauled away the post-construction debris.

Read about this job →

FAQ

House Demolition questions

Do you demolish whole houses?

Yes. Sunshine State Junk Removal takes down whole houses in Broward County, including the haul-off and site cleanup. Every house job starts with a walkthrough.

Do I need a permit to demolish a house?

Generally, yes. Whole-house demolition generally requires a demolition permit, and requirements vary by city, so check with your city's building department. Getting the permit is the property owner's or their contractor's responsibility.

Do you pull the demolition permit or disconnect the utilities?

No. The property owner or their contractor handles the permit, and utilities are disconnected by the utility providers and the appropriate parties. We'll give you a clear list of what needs to be done before demolition day.

Is asbestos notification required to demolish a house in Florida?

It can be. Florida DEP says owners and/or operators must notify the compliance office at least 10 working days before demolition of buildings subject to the Asbestos NESHAP, which excludes buildings meeting its residential exemption criteria. Check the Florida DEP asbestos page for your situation.

Is debris removal included in house demolition?

Yes. Hauling the debris away and cleaning up the site are part of the job. Clean concrete can often be kept separate as clean fill.

Ready when you are

Get a quote for house demolition

Text a few photos of the area, or book a walkthrough. We'll confirm scope, timing and the trailer size before anything starts.